Projects

 

S.No Year Client Project Location
01 2013 King Abdulaziz University Drilling and Establishment of (8) Seismic Observatory Boreholes up to a Depth of 125 M in Harrat Rahat Medina
02 2014 Baytur Const. Co. GPR Survey for Mapping of Voids and Cracks in Several Beams & Columns of Jabal Omar Development Project. Makkah
03 2014 Al Jazzar Eng. & Consulting Downhole & Crosshole Sesmic Survey for Several Construction Sites. Jeddah
04 2014 Al Jazzar Eng. & Consulting GPR Survey for Mapping Sub Surface Cavities up to a depth of 30 M at a construction site North Jeddah for an Area of 2500 M Sqr. Jeddah
05 2014 Saudi Geological Survey Drilling and Establishment of (4) Seismic Observatory Boreholes up to a Depth of 125 M in Jeddah, KAUST Thuwal, YRC Yanbu, Medinah. WR
06 2014 Saudi Aramco (YRD) GPR Survey for Mapping of Defects, Delineation and Thickness of Concrete Decks of (4) Berths at King Fahad Industrial Seaport, along with Recommendation of Repair Technique & Strategy. Yanbu
07 2014 Structural Qatar LLC GPR Survey for Sub Surface Utilities Mapping at “Internal Security Forces Compound Doha” for an Area of 40000 M Sqr. Up to a Depth of 3 M. Qatar
08 2015 Arrab Cont. Co. GPR Survey for Mapping of Voids in Several Columns of Harmain High Speed Railway Track. Jeddah
09 2015 Saudi Geological Survey Electrical Resistivity Survey to Map Benzene Contamination Plume in Soil due to leakage from a Fuel Pump. Jeddah
10 2015 Saudi Bin Laden Group – MTL GPR Survey for Mapping of Voids and Cracks in Several Beams & Columns of Al Haram Mosque. Makkah
11 2015 Azmeel EPPM GPR Survey for Sub Surface Utilities Mapping at “Yanbu Royal Commission” for an Area of 10000 M Sqr. Up to a Depth of 4 M. Yanbu
12 2015 Rabya Const. & Land Scrapping Co. GPR Survey for evaluating the depth of cracks in the concrete basement of a septic tank at Pr. Fawaz DIst. For an area of 1500 M Sqr. Jeddah
13 2015 HAPCO GPR Survey for Sub Surface Utilities Mapping at “KAUST” for an Area of 1000 M Sqr. Up to a depth of 2.5 M. Thuwal
14 2015 LOCAL CONT. Drilling of (10) Boreholes for Dewatering up to depth of 40 M. N. Jeddah
15 2015 LOCAL CONT. Drilling of (10) Boreholes for Shoring up to depth of 15 M. N. Jeddah